Goal

Install an EVSE circuit that matches equipment requirements and passes inspection.

Inputs you must know before you start

  • EVSE nameplate requirements and installation instructions.
  • Panel capacity and available breaker space.
  • Installation location (garage, outdoors, parking area).

The path (in order)

  1. Confirm EVSE load and required breaker size.
  2. Select wiring method and conductor size for continuous load.
  3. Provide required disconnecting means or verify integral disconnect.
  4. Apply required GFCI protection based on location.
  5. Label the circuit and verify operation.

This is

A focused checklist for EV charger circuit compliance.

This is not

A service load calculation or demand management guide.

Inspection-ready checklist

  • EVSE nameplate and breaker size match.
  • Conductors sized for continuous load.
  • Disconnecting means provided where required.
  • GFCI protection applied where required.
  • Circuit labeled at panel and equipment.

Worked example

A 48A EVSE specifies a 60A breaker. You size the conductors for a 60A circuit, install a listed EVSE disconnect where required, and apply GFCI if the location triggers it. The panel directory notes "EVSE Garage."

Cross references

  • Primary: 625.40, 625.41, 625.60
  • Secondary: 210.8, 110.3(B)