PV rapid shutdown playbook

Goal

Ensure PV rapid shutdown requirements are met and properly labeled.

Inputs you must know before you start

  • PV system layout and array boundaries.
  • Rapid shutdown equipment type and listing.
  • Required labeling locations.
  • System voltage and interconnection details.

The path (in order)

  1. Identify the rapid shutdown boundary and required zones.
  2. Confirm listed rapid shutdown equipment is installed.
  3. Verify operation of rapid shutdown function.
  4. Install required labels and signage.
  5. Document testing and commissioning results.

This is

A checklist to verify rapid shutdown compliance for PV systems.

This is not

A full PV system design or interconnection plan.

Inspection-ready checklist

  • Rapid shutdown boundary confirmed.
  • Listed equipment installed and accessible.
  • Shutdown function tested and documented.
  • Required labels installed and legible.

Worked example

A rooftop PV array is checked for rapid shutdown boundary compliance, the shutdown device is tested, and labeling is installed at required locations.

Cross references

  • Primary: 690.12
  • Secondary: 690.56, 705