Service entrance checklist playbook
Goal
Verify service entrance equipment, protection, and clearances before inspection.
Inputs you must know before you start
- Service rating and equipment type.
- Required GFP and SPD provisions.
- Working space and access constraints.
- Grounding and bonding method.
The path (in order)
- Confirm service disconnect location and grouping.
- Verify working space and access.
- Check GFP requirements and settings.
- Confirm SPD installation and labeling.
- Verify grounding and bonding connections.
- Document labels, settings, and equipment details.
This is
A focused checklist for service entrance inspection readiness.
This is not
A full service load calculation or utility coordination plan.
Inspection-ready checklist
- Service disconnect accessible and grouped.
- Working space meets clearance requirements.
- GFP installed where required with documented settings.
- SPD installed and labeled per listing.
- Grounding and bonding connections verified.
Worked example
A service entrance is reviewed for proper disconnect grouping, GFP settings, SPD installation, and working space prior to rough inspection.
Cross references
- Primary: 230
- Secondary: 230.95, 230.67, 110.26, 250