Feeder sizing playbook
Goal
Size a feeder based on calculated demand, conductor ampacity, and OCPD requirements with a clear inspection trail.
Inputs you must know before you start
- Calculated demand load and diversity assumptions.
- Installation method, ambient conditions, and conductor counts.
- Available standard OCPD ratings and equipment terminations.
- Grounding and bonding method for the system.
The path (in order)
- Calculate demand load for the feeder.
- Select conductors based on ampacity and adjustment factors.
- Choose OCPD from standard ratings that match the conductor limits.
- Confirm grounding and bonding conductors are sized and connected.
- Verify raceway fill and installation constraints.
- Document assumptions, references, and final selections.
This is
A repeatable method for sizing feeders using demand calculations and standard ampacity/OCPD logic.
This is not
A substitute for engineering studies or specialty system design.
Inspection-ready checklist
- Demand calculation documented with references.
- Conductor ampacity after adjustment recorded.
- OCPD rating consistent with conductor limits.
- Grounding and bonding conductors verified.
- Raceway fill and routing checked.
Worked example
A feeder serving multiple loads is sized from a demand calculation, then conductors are selected with ambient corrections. The OCPD is chosen from a standard rating that does not exceed conductor limits, and the raceway fill is checked before installation.
Cross references
- Primary: 215, 220
- Secondary: 310, 240, 110.14(C), 250