MWBC installation playbook
Goal
Install a multiwire branch circuit safely with correct phasing, neutral continuity, and disconnecting means.
Inputs you must know before you start
- Panelboard type and available breaker options.
- Circuit layout and shared neutral routing.
- Device locations and neutral connection requirements.
- Required identification and labeling practices.
The path (in order)
- Confirm opposite-phase ungrounded conductors for shared neutral.
- Select a common disconnecting means or handle-tied breakers.
- Maintain neutral continuity through devices and splices.
- Identify shared neutrals and multiwire circuits at the panel.
- Test circuit operation and document labeling.
This is
A repeatable MWBC installation checklist that avoids open-neutral hazards.
This is not
A full load balancing or harmonic analysis guide.
Inspection-ready checklist
- Common disconnecting means installed.
- Neutral continuity maintained at all devices.
- Conductors identified and labeled.
- Circuit operation verified.
Worked example
An MWBC serves two kitchen circuits with a shared neutral. The installer uses a common disconnect, keeps neutral continuity at devices, and labels the circuit at the panel.
Cross references
- Primary: 210.4
- Secondary: 300.13, 210.7, 240